'; } ?>

Construction Scheduler/ Project Controls Job at ASR International Corp.

ASR International Corp. Pensacola, FL 32508

$57,947 - $90,000 a year

Client: NAVFAC SOUTHEAST

Location: Naval Air Station Pensacola – Pensacola, FL
Title: Scheduler – Construction Management
Clearance: Ability to successfully clear background checks and security assessments

Scope: The Scheduler shall review construction contractor’s schedules, equipment delivery plans and progress to date and use this data to perform monthly projections and reports of Construction Work in Place for the upcoming months on a project-by-project basis.

Duties / Responsibilities include, but not limited to the following:

1. Prepare and/or analyze the design and construction schedules for all including but not limited to construction contractor’s prepared network analysis schedule (NAS) submitted by the construction contractors for
Government approval.

2. The Scheduler shall review construction contractor’s schedules, equipment delivery plans and progress to date and use this data to perform monthly projections of Construction Work in Place for the upcoming months on a project-by-project basis. These projections will be entered in the Construction Management System or other
Government databases and data reports as directed.

3. The Scheduler shall analyze the NAS for reasonableness in activity durations, sequencing, and logic. The
Scheduler shall also evaluate the activities included in the NAS for adequacy and appropriateness, and recommended additions or deletions of particular activities.

4. For each construction project/task order the SSC contractor shall submit a report consisting, at a minimum, the following:
4.1 An introduction containing background information such as the contract number and project name, construction contractor, and a brief description of the methods utilized by the Sally Support Contractor
(SSC) as in analyzing the NAS.

4.2 A statement of factual information regarding the content of the NAS, its logic, sequencing, and durations.
4.3 A narrative of SSC contractor comments, both objective and subjective, regarding the adequacy of the NAS and suggestions for improvement.
4.4 A recommendation to the Government as to whether the NAS should be rejected, approved, or approved contingent upon incorporation of specific comments.
5. Perform schedule impact analyses in support of change order requests, anticipated claims, and Requests for

Equitable Adjustment.
6. Provide support to Government personnel on construction schedule review/analysis including notes, comments, and recommendations.
7. The Scheduler may be tasked to assist/provide informal schedule workshop/training to the Resident Officer in

Charge of Construction (ROICC) personnel.
8. The Scheduler may be tasked to collaborate with the ROICC representative on the development of a schedule review guide sheet with examples to document the general steps for reviewing baseline construction schedules or monthly progress schedules and for performing schedule impact analyses.

Qualifications, Education and Other Requirements:
1. Shall either be (1) a graduate of an accredited college or university with a Bachelor of Science in Engineering

Technology or Construction Management and having 5 years of construction scheduling experience, or (2) have 10 years of construction scheduling experience.

2. Scheduling experience shall be for construction projects of varying complexity having construction cost in the range of $25M or greater.

3. Proficient in the use of Primavera P6, Claim Digger, Microsoft Word, Excel, PowerPoint, Outlook, and Adobe
Acrobat Professional.

4. Ability to analyze the construction contractor’s prepared cost loaded Network Analysis Schedule (NAS).
5. Ability to identify potential conflicts and constraints to the construction project and provide recommendations to mitigate potential delays.
6. Shall have experience performing construction schedule analysis including digger programs, analysis of changes to the Critical Path due to construction modifications and delay analysis.

7. Ability to communicate effectively in English both orally and in writing. Experience in preparing correspondence, written reports, and in briefing management personnel.

8. Experience and familiarity with Federal building criteria and construction guide specifications.
9. Must hold a certificate in USACE Construction Quality Management (CQM) for Contractors Training (maintain valid 5-year certificate) or obtain certification within 60 days of onboarding.
10. Possess a current, valid driver’s license issued by a US state or territory.
11. Provide satisfactory proof of U.S. citizenship.

Note: Candidacy is subject to client approval, and successful clearing of background and security checks.

Job Type: Full-time

Pay: $57,946.53 - $90,000.00 per year

Benefits:

  • 401(k)
  • Dental insurance
  • Health insurance
  • Paid time off
  • Vision insurance

Schedule:

  • 8 hour shift

Ability to commute/relocate:

  • Pensacola, FL 32508: Reliably commute or planning to relocate before starting work (Required)

Education:

  • Bachelor's (Required)

Experience:

  • Project Controls: 5 years (Required)
  • Microsoft Excel: 5 years (Required)
  • Primavera P6: 5 years (Required)

Work Location: In person




Please Note :
bankofmontserrat.ms is the go-to platform for job seekers looking for the best job postings from around the web. With a focus on quality, the platform guarantees that all job postings are from reliable sources and are up-to-date. It also offers a variety of tools to help users find the perfect job for them, such as searching by location and filtering by industry. Furthermore, bankofmontserrat.ms provides helpful resources like resume tips and career advice to give job seekers an edge in their search. With its commitment to quality and user-friendliness, Site.com is the ideal place to find your next job.